• Ícone Renewable Energy Type of work
    Renewable Energy
  • Cliente Client
    Arcadis
  • Potência Power
    82 MW
  • Localização Location
    Pompéu/Curvelo
    Minas Gerais
  • Period
    2008 / 2009
  • Object: hydroelectric exploitation.

    Participation: execution of concrete works.

    Description: execution of concrete works at Retiro Baixo UHE (Hydroelectric Power Stations), owned by Consórcio Construtor Retiro Baixo (CCRB), located in Felixlândia, MG, using the Hydroelectric Exploitation of Paraopeba River.

    Its spillway, controlled with segment floodgates, has a capacity of 3,955 m³/s and a length of 132.29 m. In its powerhouse, two generating units are installed, equipped with Kaplan type tur-bines and 41 MW unit nominal power.

    Gallery

    Click on the map to see the works by State

    Mapa de Obras - Regiões Placeholder
    Mapa de Obras - Regiões

    News

    UFV Verde Vale III, best-performance Photovoltaic Plant in Brazil

    A study made by BEI BRASIL ENERGIA INTELIGENTE classifies the UFV Verde Vale III as the best-performance photovoltaic plant in Brazil (among all 93 UFVs of the CCEE’s report), considering the relationship between the energy generation and installed power since the month following that of the entry into generation of the undertakings. The official reports…

    Read all

    The Environmental Licensing of the Quartéis Complex

    Open to the community, Public Meetings will be conducted by the Superintendência de Projetos Prioritários – SUPPRI.

    Read all

    Drone amplia qualidade das imagens Quebec

    Imagens feitas através de captação por drone, mostra a beleza do projeto PCH Serra das Agulhas, executado pela Quebec.

    Read all
    2021 – All rights reserved – © Quebec Engenharia
    ^