  • Object: implantation of photovoltaic plant.

    Participation: execution of the project, supply, construction and assembly of the solar energy plant under EPC Turn Key regime.

    Description: elaboration of civil and electromechanical executive project, supply of modules, trackers, inverters, cables, stringboxes 1500 V, civil works, electromechanical assembly, development of SCADA and commissioning of the solar field of UFV Assuruá, located in Itaguaçu da Bahia, BA, and belonging to SPE Assuruá Geradora de Energia Solar S/A, with installed power of 37 MWp, 28 inverters and total of 319,200 thin film modules of 117.5 W, mounted on 1,330 trackers.

    Elaboration of civil and electromechanical executive project, supply of equipment and structures, civil works, electromechanical assembly, development of PSCS, commissioning of a 34.5/69 kV elevating substation and a 69 kV switching substation in the Coelba standard.

    The thin film technology of CdTe (cadmium telluride), more modern than those of mono and polycrystalline silicon, was pioneered used in Brazil at UFV Assuruá – cutting-edge heliotropic technology, also in the use of solar trackers, which move the plates throughout the day so that they are always facing the sun – an increase of up to 30% in total energy generation over time.

    Gallery

    Click on the map to see the works by State

    Mapa de Obras - Regiões Placeholder
    Mapa de Obras - Regiões

    News

    UFV Verde Vale III, best-performance Photovoltaic Plant in Brazil

    A study made by BEI BRASIL ENERGIA INTELIGENTE classifies the UFV Verde Vale III as the best-performance photovoltaic plant in Brazil (among all 93 UFVs of the CCEE’s report), considering the relationship between the energy generation and installed power since the month following that of the entry into generation of the undertakings. The official reports…

    Read all

    The Environmental Licensing of the Quartéis Complex

    Open to the community, Public Meetings will be conducted by the Superintendência de Projetos Prioritários – SUPPRI.

    Read all

    Drone amplia qualidade das imagens Quebec

    Imagens feitas através de captação por drone, mostra a beleza do projeto PCH Serra das Agulhas, executado pela Quebec.

    Read all
    2021 – All rights reserved – © Quebec Engenharia
    ^