• Ícone Infrastructure Type of work
    Infrastructure
  • Cliente Client
    CBTU
  • Localização Location
    Contagem
    Minas Gerais
  • Period
    1995/1996
  • Object: recovery of the runway pavement of the road transport integration terminal with the metro.

    Participation: excavation services, deep drain construction with concrete pipes and geotextile membrane, sub-base replacement, crushed stone draining mattress, execution of base and sub-base, paving in articulated concrete.

    Gallery

    Click on the map to see the works by State

    Mapa de Obras - Regiões Placeholder
    Mapa de Obras - Regiões

    News

    UFV Verde Vale III, best-performance Photovoltaic Plant in Brazil

    A study made by BEI BRASIL ENERGIA INTELIGENTE classifies the UFV Verde Vale III as the best-performance photovoltaic plant in Brazil (among all 93 UFVs of the CCEE’s report), considering the relationship between the energy generation and installed power since the month following that of the entry into generation of the undertakings. The official reports…

    Read all

    The Environmental Licensing of the Quartéis Complex

    Open to the community, Public Meetings will be conducted by the Superintendência de Projetos Prioritários – SUPPRI.

    Read all

    Drone amplia qualidade das imagens Quebec

    Imagens feitas através de captação por drone, mostra a beleza do projeto PCH Serra das Agulhas, executado pela Quebec.

    Read all
    2021 – All rights reserved – © Quebec Engenharia
    ^