• Ícone Renewable Energy Type of work
    Renewable Energy
  • Potência Power
    50,3 MW
  • Localização Location
    Rondonópolis
    Mato Grosso
  • Period
    2006 / 2008
  • Work executed in a complex of 2 Power Plants, simultaneously.

    Object: hydroelectric exploitation.

    Participation: execution, through Toctao Quebec Consortium (CTQ), of all civil works of the hydroelectric complex, including earthworks, concrete works, open-cast adductor channel covered with PEAD membrane (high-density polyethylene) and finishing.

    Description: complex formed by PCH’s Rondonópolis and Engineer José Gelásio da Rocha, both located in the State of Mato Grosso, totaling 50.3 MW of installed power.

    Power Plant 1 – PCH Rondonópolis 26.6 MW

    Power Plant 2 – PCH Eng. José Gelásio da Rocha 23.7 MW

    Gallery

    Click on the map to see the works by State

    Mapa de Obras - Regiões Placeholder
    Mapa de Obras - Regiões

    News

    UFV Verde Vale III, best-performance Photovoltaic Plant in Brazil

    A study made by BEI BRASIL ENERGIA INTELIGENTE classifies the UFV Verde Vale III as the best-performance photovoltaic plant in Brazil (among all 93 UFVs of the CCEE’s report), considering the relationship between the energy generation and installed power since the month following that of the entry into generation of the undertakings. The official reports…

    Read all

    The Environmental Licensing of the Quartéis Complex

    Open to the community, Public Meetings will be conducted by the Superintendência de Projetos Prioritários – SUPPRI.

    Read all

    Drone amplia qualidade das imagens Quebec

    Imagens feitas através de captação por drone, mostra a beleza do projeto PCH Serra das Agulhas, executado pela Quebec.

    Read all
    2021 – All rights reserved – © Quebec Engenharia
    ^