• Ícone Infrastructure Type of work
    Infrastructure
  • Cliente Client
    Cesama
  • Localização Location
    Juiz de Fora
    Minas Gerais
  • Period
    1994/1995
  • Object: recovery services for the adduction system for the bottom discharge from the dam.

    Participation: development of technical solutions and execution of underwater works for the concreting of reinforcement slab, recovery of the sealing frame and restoration of the damaged concrete structure, execution of underground services for the reconditioning of the steel bottom discharge pipe, with a diameter of 1,550 m, assembly of reinforcement rings along the piping and injection of cement grout for waterproofing and contact.

    Gallery

    Click on the map to see the works by State

    Mapa de Obras - Regiões Placeholder
    Mapa de Obras - Regiões

    News

    UFV Verde Vale III, best-performance Photovoltaic Plant in Brazil

    A study made by BEI BRASIL ENERGIA INTELIGENTE classifies the UFV Verde Vale III as the best-performance photovoltaic plant in Brazil (among all 93 UFVs of the CCEE’s report), considering the relationship between the energy generation and installed power since the month following that of the entry into generation of the undertakings. The official reports…

    Read all

    The Environmental Licensing of the Quartéis Complex

    Open to the community, Public Meetings will be conducted by the Superintendência de Projetos Prioritários – SUPPRI.

    Read all

    Drone amplia qualidade das imagens Quebec

    Imagens feitas através de captação por drone, mostra a beleza do projeto PCH Serra das Agulhas, executado pela Quebec.

    Read all
    2021 – All rights reserved – © Quebec Engenharia
    ^