New Energy Tender “A-4”

The Ministry of Mines and Energy (MME) published in the Federal Official Gazette the Ordinance No. 230, with the official rules for the New Energy Tender “A-4” of 2019.

The following shall be traded:

a) three QUANTITY PRODUCTS:

1 – HIDRO, starting in 2023 and ending in 2052, whose source consists of:

  • Hydroelectric Power Plant (CGH);
  • Small Hydroelectric Plant (PCH)
  • Hydroelectric Power Station (UHE) with a power output under or equal to 50 MW;
  • expansion of existing power plants;

2 – WIND, starting in 2023 and ending in 2042;

3 – SOLAR, starting in 2023 and ending in 2042;

b) a PRODUCT AVAILABILITY;

4 – BIOMASS, starting in 2023 and ending in 2042;

In the definition of the BATCHES associated to a given MOVE, the electric losses, from the reference point of the physical guarantee of the enterprise to the Severity Center of the Submarket, and, when applicable, the internal losses and the internal consumption of the enterprise, shall be considered.

Quebec Works in Brazil

Mapa de Obras - Regiões Placeholder
Mapa de Obras - Regiões

News

UFV Verde Vale III, best-performance Photovoltaic Plant in Brazil

A study made by BEI BRASIL ENERGIA INTELIGENTE classifies the UFV Verde Vale III as the best-performance photovoltaic plant in Brazil (among all 93 UFVs of the CCEE’s report), considering the relationship between the energy generation and installed power since the month following that of the entry into generation of the undertakings. The official reports…

Read all

The Environmental Licensing of the Quartéis Complex

Open to the community, Public Meetings will be conducted by the Superintendência de Projetos Prioritários – SUPPRI.

Read all

Drone amplia qualidade das imagens Quebec

Imagens feitas através de captação por drone, mostra a beleza do projeto PCH Serra das Agulhas, executado pela Quebec.

Read all
2021 – All rights reserved – © Quebec Engenharia
^